Summer Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

SAP E_S4CON_2505 SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade Exam Practice Test

Demo: 12 questions
Total 40 questions

SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question 1

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correctanswersto this question.

Options:

A.

SAP S/4HANA conversion including database migration and Unicode conversion

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migration SAP S/4HANA conversion without database migration

D.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Question 2

You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step. Where can you change this during the migration via the Utilities option of the SUM UI? Note: There are 2 correctanswersto this question.

Options:

A.

In DMO Migration Preparation

B.

In SUM Parameters

C.

In SUM Phaselist

D.

In Process Control Center

Question 3

You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correctanswersto this question.

Options:

A.

Modification adjustment (SPAU)

B.

Modification adjustment (SPDD)

C.

Activation of dictionary objects (ACT_UPG)

D.

Conversion of application tables (PARCONV_UPG)

Question 4

During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAU. There you find programs that are shown in status "automatic adjustment" (green traffic light). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

Options:

A.

SUM continues with the next phase and your modifications are kept as in the start release.

B.

SUM refuses to continue unless you have marked a transport request as modification adjustment transport.

C.

SUM continues with the next phase, and your modified objects are set to the new SAP standard.

D.

Before continuing with the next phase, SUM asks for a modification adjustment transport.

Question 5

What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correctanswersto this question.

Options:

A.

It contains a section about the simplification item (SI) checks.

B.

It explains the database migration option (DMO) of SUM.

C.

It is a database-specific document.

D.

It explains where to find information about the custom code analysis.

Question 6

Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correctanswersto this question.

Options:

A.

Check the dump size of the database export on disk.

B.

Check the log files written in the SUM directory, subdirectory abap, subdirectory log.

C.

Check logs for jobs starting with RSUPG_SGEN in the SAP system.

D.

Check the Charts Control Center in the SUM UI.

Question 7

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correctanswersto this question.

Options:

A.

Software update

B.

Main import

C.

Migration

D.

Conversion

Question 8

You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

Options:

A.

Using R3load and memory pipes

B.

Using work processes and network socket connection

C.

Using R3load and file transfer

D.

Using R3load and network socket connection

Question 9

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.

Downtime conversion

B.

Downtime migration

C.

Shadow on target creation

D.

Silent data migration (SDM)

Question 10

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

Options:

A.

To optimize the conversion

B.

To optimize the main import

C.

To optimize the migration

D.

To optimize the activation

Question 11

What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

Options:

A.

Migration Server

B.

Migration Hub

C.

Transition Server

D.

Central Instance

Question 12

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correctanswersto this question.

Options:

A.

TABIM_UPG

B.

PARDIST_SHD

C.

PARMVNT_UPG

D.

TABIM_SHADOW_*

Demo: 12 questions
Total 40 questions