SAP C_TS422_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Exam Practice Test

Demo: 24 questions
Total 80 questions

SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Questions and Answers

Question 1

In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

Options:

A.

MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.

B.

MRP creates the capacity requirements without considering existing load on the work centers.

C.

MRP creates the capacity requirements at the earliest possible time.

D.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

Question 2

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Options:

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

B.

The consistency check must be performed.

C.

The assigned routing and bill of material (BOM) must be valid in the entire validity period.

D.

The assigned routing and bill of material (BOM) must have the same validity period.

E.

The lot size range must be within the lot size range of the assigned routing.

Question 3

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

Options:

A.

First in first out (FIFO)

B.

Simultaneous

C.

Manual maintenance

D.

100% check

Question 4

What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.

Options:

A.

Change the assignments of production quantities to production lines.

B.

Create new production quantities.

C.

Dispatch operations to work centers.

D.

Reschedule and deallocate operations.

Question 5

Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

Options:

A.

Work center

B.

Plant

C.

Production version

D.

Material

Question 6

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

By material type

B.

By plant

C.

By period

D.

By material status

Question 7

Where does the system check master data selection settings during the creation of planned orders or production orders? Note: There are 3 correct answers to this question.

Options:

A.

In the production version

B.

In the work centers

C.

In the bill of material (BOM)

D.

In the MRP controller

E.

In the routing

Question 8

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

Options:

A.

The quantity and value updates are the same.

B.

The same batch management level is used.

C.

The same base unit of measure is used.

D.

The same account category is used.

Question 9

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

Options:

A.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Question 10

Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

Options:

A.

Use a resource group.

B.

Use a planning group.

C.

Use a propagation range.

D.

Use a planning area.

Question 11

What are the advantages of collective orders? Note: There are 2 correct answers to this question.

Options:

A.

To perform availability checks across the entire collective order

B.

To coordinate orders in the planning board for a collective order

C.

To show the flow of batches across the entire collective order

D.

To post confirmations for the entire collective order

Question 12

Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.

Options:

A.

Integrated Business Planning (IBP)

B.

Supply Chain Management (SCM)

C.

Material Requirements Planning (MRP)

D.

Capacity Requirements Planning (CRP)

Question 13

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

In which storage location is the BOM required?

B.

Is the material type allowed in the BOM?

C.

Which base unit of measure does the material have?

D.

What status does the BOM have?

Question 14

What does a line hierarchy in repetitive manufacturing represent?

Options:

A.

A production line with more than one work center

B.

A production line with an alternative sequence in the routing

C.

A production line with a parallel sequence in the routing

D.

A production line with prioritized alternative work centers

Question 15

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

Options:

A.

Assign the alert profile to the overall profile.

B.

Assign the overall profile to the authorization profile.

C.

Create an object selection variant for alerts according to the priority of ATP categories.

D.

Create an object selection variant for production-planning-related alerts.

Question 16

What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

Options:

A.

One-off events

B.

Past production planning quantities

C.

Past quotation quantities

D.

Market intelligence

E.

Past sales order quantities

Question 17

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

Options:

A.

Wait time

B.

Float before production

C.

Processing time

D.

Pick time

E.

Setup time

Question 18

What can you use standard heuristics in Advanced Planning (PP/DS) for?

Options:

A.

To automate material movements in material staging

B.

To set default values in production master data

C.

To solve planning problems for defined objects

D.

To optimize costs and times in production plans

Question 19

Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

Options:

A.

Procurement type

B.

Material type

C.

MRP type

D.

MRP group

Question 20

Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

Options:

A.

Production orders

B.

Planned orders (firmed)

C.

Planned orders (unfirmed)

D.

ATP quantities

Question 21

How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

Options:

A.

Digital signature

B.

Approved resources

C.

Recipe approval

D.

GMP-compliant flag

E.

Batch record

Question 22

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

Options:

A.

Efficiency

B.

Accuracy

C.

Timeliness

D.

Stability

Question 23

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

Options:

A.

Execute an infinite production planning run for the critical resources.

B.

Reduce the planning time interval.

C.

Determine a time period with available capacity on the planning board.

D.

Increase the capacity supply in a time-phased interval.

E.

Form optimum sequences to reduce setup times.

Question 24

Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

Options:

A.

Opening period

B.

Total replenishment lead time

C.

Float after production

D.

Setup time