Which Purity command can be used to validate I/O is balanced across initiators?
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?
When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
Which PCIe slot supports 4-port FC cards on FlashArray//XL?
On a FlashArray//XR50R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?
After runningpuredb run giveback --safecommand once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
When transforming an array from SAS to NVMe with the Evergeen XFORM upgrade, when should a swing shelf be installed?
At the completion of an upgrade, which command is used to send phonehome logs?
An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?
When performing an install on a FlashArray, what step should be taken first?
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?
A customer has filled out the Installation Workbook. The management IP information netmask is specified as “255.255.255.223” and the gateway is specified as “10.24.18.1”. What corrective action should be taken to reconcile the IP configuration?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers.
Which command should the Implementation Engineer run to list the NTP servers that have been configured?
What upgrade scenario required an upgrade of power supplies?
What is the speed of the Ethernet ports to connect a FlashArray //E to a DFS?
After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?
What is the redundancy of the FlashArray//XL PSUs?
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS).
What action should the Implementation Engineer perform?
If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?
After an Implementation Engineer installs a new FlashArray and runs health checks, they see that Phonehome and Remote Assist are NOT working correctly.
Which outbound port needs to be open for all management ports (physical and virtual)?
A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?