Labour Day Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

IBM C2010-555 IBM Maximo Asset Management v7.6 Functional Analyst Exam Practice Test

Demo: 21 questions
Total 144 questions

IBM Maximo Asset Management v7.6 Functional Analyst Questions and Answers

Question 1

A company has a requirement to share calendar, classification, job plan, item description and PM data.

What needs to be created?

Options:

A.

Single organization, single site environment

B.

Multiple organizations with a shared site environment

C.

Multiple organizations with one site per organization environment

D.

Multiple organizations with multiple sites per organization environment

Question 2

A company has a requirement to temporarily give a user the privilege to run the application's manual status change actions and specify this in a workflow process.

Which of the following actions would be used?

Options:

A.

PVSTATUS and NOSTATUS

B.

OKSTATUS and PVSTATUS

C.

NOSTATUS and OKSTATUS

D.

PVSTATUS, NONSTATUS and OKSTATUS

Question 3

A work order has the Originating Record field populated.

What Relationship would be seen for the work order listed on the Related Records tab?

Options:

A.

PARENT

B.

RELATED

C.

FOLLOWUP

D.

ORIGINATOR

Question 4

A supervisor has a requirement in Labor Reporting to report labor hours for work that has been completed.

What are the options available to report labor?

Options:

A.

labor, craft, company, and work order

B.

labor, crew, vendor/contract, work order and ticket

C.

labor, crew, vendor/contract, work order and ticket group

D.

labor, crew, vendor/contract, work order, activity and task

Question 5

An asset requires maintenance on a monthly, quarterly and annual basis. Three job plans have been created to meet this requirement called MONTHLY, QUARTERLY and ANNUAL. What is the correct job plan sequence that needs to be used?

Options:

A.

MONTHLY=1, QUARTERLY=4, ANNUAL=1

B.

MONTHLY=12, QUARTERLY=4, ANNUAL=1

C.

MONTHLY=3, QUARTERLY=4, ANNUAL=12

D.

MONTHLY=1, QUARTERLY=3, ANNUAL=12

Question 6

A company has a requirement to have items in the storerooms to be reordered automatically.

How can this be achieved?

Options:

A.

Reorder Escalation

B.

Reorder Cron Task

C.

Reorder – Reorder Items

D.

Reorder Direct Issue Items/Services

Question 7

If the status of an item record is modified in the Item Master application, which two other records need to be updated in order for the item to be purchase and stocked? (Choose two.)

Options:

A.

the item’s Company status

B.

the item’s Organizational status

C.

the status of the item for the Set

D.

the status of the item for the Site

E.

the status of the item in inventory

Question 8

A company orders and receives a case containing 36 light bulbs which are issued one at a time. What is created for this relationship?

Options:

A.

Multiplier

B.

Issue Unit

C.

Issue Type

D.

Conversion

Question 9

A company wishes to create a location that is used during the receiving process when inspection occurs.

Which type of location is used?

Options:

A.

A HOLDING location at the SITE level.

B.

A CLEARING location at the ORG level.

C.

A RECEIVING location at the SITE level.

D.

An INSPECTION location at the ORG level.

Question 10

A company has a number of complex leased assets and wishes to stop child assets that are part of the subassembly from being moved. How can this be accomplished?

Options:

A.

Check the Maintain Hierarchy checkbox on the asset record

B.

Check the Lock Asset checkbox on the Lease Rental Contract

C.

Check the Maintain Hierarchy checkbox on the rotating item record

D.

Check the Maintain Hierarchy checkbox on both the asset and the item record

Question 11

Which of the following settings values will determine the number of items to be ordered during the reorder process?

Options:

A.

Safety Stock

B.

Reorder Point

C.

Conversion Factor

D.

Economic Order Quantity

Question 12

A buyer runs a BIRT report which details Supplier Compliance. The buyer needs to further analyze the data in a spreadsheet to include an additional graph before reviewing the information with the manager.

Which process transforms the data?

Options:

A.

Export

B.

Preview

C.

Application Export

D.

Report Transformation

Question 13

A user needs to return a rotating asset from a repair location to an inventory location.

What is the correct step to achieve this?

Options:

A.

Use the Move/Modify action in the Assets application

B.

Use the Move/Modify action in the Locations application

C.

Use the Select rotating asset for return in the Receiving application

D.

Use the Move/Swap/Modify action in the Preventive Maintenance application

Question 14

An administrator has been informed that a direct issue item for a work order is not required and need to be returned.

What does the administrator need to do?

Options:

A.

From the Receiving application select items for Return

B.

From the Storerooms application select Return Item to Main Storeroom

C.

Form the Work Order Tracking application select Return Direct Issue Item

D.

Create a return transaction type for the item in the Work Order Tracking application

Question 15

Where can an end user see in-depth details of a KPI, including its long description, communication logs and configurable historical trending?

Options:

A.

KPI Viewer

B.

Start Center

C.

KPI Manager

D.

KPI Template

Question 16

A company wants to create a rotating (serialized) tool to issue to a Labor or Work Order.

Which of the following tasks are necessary?

Options:

A.

Insert new record in the Tools application, check the Rotating checkbox, add to Storeroom.

B.

Insert new record in the Stocked Tools application, check the Rotating checkbox, add to Storeroom.

C.

Insert new record in the Item Master application, check the Rotating checkbox, add the record to Tools application.

D.

Insert new record in the Item Master application, check the Rotating checkbox, add the record to Stocked Tools application.

Question 17

A supervisor has a requirement to group labor transactions by work order number while creating invoices in Labor Reporting.

How can this be achieved?

Options:

A.

Check the Consolidate by Work Order checkbox for each transaction.

B.

Enter the work order number, then enter each associated transaction.

C.

Check the Group Labor by Work Order checkbox for each transaction.

D.

Create an invoice for each work order, then enter each associated transaction.

Question 18

The user wants to have a new job plan reference an existing job plan so that the data in the existing job plan will be available without re-entering it.

What is the name of this feature?

Options:

A.

Nested job plans

B.

Job plan revisions

C.

Job plan sequences

D.

Attachment job plans

Question 19

When a route is applied to a work order, which of the following is possible result?

Options:

A.

A multilevel work order hierarchy

B.

Job plan tasks under work order tasks

C.

A report of work order operational steps

D.

Entries in the Assets, Locations and CI applications

Question 20

A fixed-schedule PM needs to be set up.

What other setting need to be selected in addition to the frequency value?

Options:

A.

Alert Lead (DAYS) must equal 0

B.

Alert Lead (DAYS) must be greater than 0

C.

Use Last Work Order's Start Date to Calculate Next Due Date? checked

D.

Use Last Work Order's Start Date to Calculate Next Due Date? unchecked

Question 21

An engineer schedules a very complex asset report developed in BIRT. The engineer needs to set a feature to be able to retrieve the report contents from within Maximo for very large files that are restricted by the email server.

Which feature does this?

Options:

A.

Direct Print

B.

Email with a File URL

C.

Email with a File Attachment

D.

REPORTSCHEDULE cron task

Demo: 21 questions
Total 144 questions