Labour Day Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

IBM C1000-132 IBM Maximo Manage v8.0 Implementation Exam Practice Test

Demo: 9 questions
Total 64 questions

IBM Maximo Manage v8.0 Implementation Questions and Answers

Question 1

When viewing a Storeroom in the Manage Inventory Work Center, what are three record sets (tabs) that can be viewed?

Options:

A.

Child Storerooms

B.

Year to Date Figures

C.

Counts

D.

Vendors

E.

Reconcile

F.

Balances

Question 2

In which status can a Job Plan be modified to add a new task?

Options:

A.

NEW

B.

REVISED

C.

INACTIVE

D.

PNDREV

Question 3

In what Maximo Manage application are the specifications of an asset for calibration entered?

Options:

A.

Classifications

B.

Asset

C.

Data Sheet Template

D.

Improvements

Question 4

How can a Master Preventive Maintenance record be associated with multiple non-rotating assets?

Options:

A.

Use the Move/Modify Assets action.

B.

Use an Asset Template.

C.

Add the Assets to the Multiple Assets table on the Master Preventive Maintenance record.

D.

Use the Apply Down Hierarchy action on the Master Preventive Maintenance record.

Question 5

In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?

Options:

A.

COMPLETE

B.

RETURNED

C.

PARTIAL

D.

NONE

E.

WINSP

F.

VOID

Question 6

What is a licensing method used to obtain the Maximo Asset Suite?

Options:

A.

Cloud based license

B.

Feature based license

C.

Monthly license

D.

User credits license

Question 7

What is the purpose of the Admin mode?

Options:

A.

change System Properties without needing to shut down the Maximo server

B.

perform Database Configuration without needing to shut down the Maximo server

C.

apply changes in Application Designer

D.

perform administrative functions

Question 8

How is the Lock Out / Tag Outs application structured?

Options:

A.

Specify a Lock Out on an Asset with a Locking Device and define the Tag Out Operations.

B.

Specify a Lock Out on the Location or Asset and define the Tag Out Operations.

C.

Specify a Tag Out on the Location or Asset and define the Lock Out Operations.

D.

Define the isolation procedures on a set of related assets and specify a sequence.

Question 9

In the Assets application a used engine needs to be replaced with a rebuilt engine, how might the rebuilt engine inherit the depreciation schedule from the used engine?

Options:

A.

Use the action Exchange Depreciation Schedules.

B.

Use the action Copy Depreciation Schedules.

C.

Use the action Swap Depreciation Schedules.

D.

Use the action Split Depreciation Schedules.

Demo: 9 questions
Total 64 questions