Labour Day Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

IBM C1000-038 IBM z14 Technical Sales Exam Practice Test

Demo: 6 questions
Total 45 questions

IBM z14 Technical Sales Questions and Answers

Question 1

When planning a new disk unit to populate the reserved 16U space on a z14 ZR1, what could prevent this installation?

Options:

A.

Weight and power consumption

B.

6U minimum and Flash

C.

8U minimum and two power cords

D.

Height and maximum capacity

Question 2

Which of the following is used to consolidate host channels on an IBM z14?

Options:

A.

FICON Aggregation analysis

B.

Fit For Purpose study

C.

CFSIZER tool

D.

zBNA tool

Question 3

A z14 customer has expressed interest in deploying firmware and software appliances on IBM Z.

What feature will enable the customer to achieve their goal?

Options:

A.

Secure Service Container (SSC)

B.

IBM Db2 Analytics Accelerator (IDAA) on IBM Z

C.

zHyperLink

D.

Linux on IBM Z running under z/VM

Question 4

An IBM customer in the distribution sector currently runs 14 applications on their z114 Model A01 server. Their software environment includes z/OS 1.9, CICS TS V3.2, and associated COBOL and FORTRAN language development environments. A third party database is also in use, connected to CICS and currently supported by the solution provider.

The Chief Technology Officer (CTO) has expressed a desire to upgrade their mainframe to new IBM Z server technology. The CTO believes the investment they make here would allow the company to ride out this new technology base for many years. Of high interest is the ability to dial up and down server capacity as business needs dictate. The CTO is asking for recommendations from IBM and third party suppliers.

Which of the following recommendations will most completely satisfy the CTO's requirements?

Options:

A.

Install an IBM z14 ZR1 server, alongside their z114 server. Doing so will offer a separate operating system build environment and allow them to stage their migration to this new technology.

B.

Implement a Managed Services Offering, allowing them to simply stay where they are and position them as platform support staff retires.

C.

Install an IBM z13 model 401 server, alongside their z114 server. Doing so will offer a separate operating system build environment and sufficient capacity options going forward.

D.

Upgrade their z114 server to a zBC12 model A01. Doing so will allow this client to install z/OS 2.3 and manage their hardware server costs.

Question 5

A customer has a new z14 and would like Container Pricing for the z/OS system based on their monthly usage.

How will the pricing be based through Resourcelink tables?

Options:

A.

MSU

B.

ITRR

C.

LSPR

D.

MIPS

Question 6

A security administrator would like to know more details about Coupling Facility Encryption. Their main concern is with Coupling Facility CPU overhead once encryption has been implemented.

Which ICF overhead consideration is associated with Coupling Facility Encryption?

Options:

A.

A Pervasive Encryption assessment can determine the overhead.

B.

Once ICA links are implemented, overhead will not be impacted

C.

Overhead is dependent on the number and type of structures to be encrypted.

D.

Encryption is z/OS based and will not impact Coupling Facility overhead

Demo: 6 questions
Total 45 questions