Question 1

When installing a water-cooled module, what is the minimum distance between the module and the wall?

Options:

A.

300 mm

B.

400 mm

C.

500 mm

D.

600 mm

Question 2

Which of the following position is recommended for installing the smart ETH gateway?

Options:

A.

Control skylight

B.

Inside a network cabinet

C.

At the inner side of a door header

D.

At the side of a cable trough

Question 3

What is the input/output voltage range of the SmartLi BCU?

Options:

A.

280415 V

B.

300400 V

C.

300480 V

D.

W00-544 V

Question 4

If the UPS5000-E is overloaded in normal mode, it transfers to bypass mode immediately. The bypass supplies power to loads to protect the UPS.

Options:

A.

True

B.

False

Question 5

During the installation of an air conditioner system, which of the following statements are correct about the draining impurities from the refrigerant pipe?

Options:

A.

Block one of the pipe ports.

B.

Fill the pipe with high-pressure nitrogen.

C.

Quickly remove the pipe plug, and avoid facing people to prevent injury.

D.

To discharge nitrogen from the outdoor unit.

Question 6

Which of the following menus can be used by engineers to manually add devices on the NetEco?

Options:

A.

Data center planning

B.

Report management

C.

Alarm management

D.

System management

Question 7

In large-scale data centers such as financial securities centers and telecom hubs. UPSs with a capacity of 200 kVA or higher are usually used. For UPS5000-E-200k, 12 V battery packs are usually configured as backup power instead of battery racks.

Options:

A.

True

B.

False

Question 8

To modify the FusionModule2000 plan view of the ECC800-Pro, users need to log in to the WebUI as admin account.

Options:

A.

True

B.

False

Question 9

After the Power Echo is installed, the default user name is admin. The password is changed upon the first login. If the password is forgotten, it can be retrieved and reset through project verification.

Options:

A.

True

B.

False

Question 10

Which of the following statements are true about the dry contact card of the integrated UPS?

Options:

A.

After the BCB port of dry contact card is connected, the BCB port can be used only ifit is enabled on the monitoringsoftware.

B.

The EPO port can be normally open or normally closed.

C.

The UPS dry contact card can be used to detect the switch status of the battery system.

D.

The dry contact card cannot detect the status of an external battery switch.

Question 11

On the ECC800-Pro WebUI, which of the following is the first-level menu of the NMS Application?

Options:

A.

System Settings

B.

Maintenance

C.

Home

D.

Monitoring

Question 12

For FusionModule2000, depending on different layout position, batteries can be deployed in the smart module or out of the smart module.

Options:

A.

True

B.

False

Question 13

After all historical alarms of the NetCol5000-A are deleted, the deletion operation is not logged.

Options:

A.

True

B.

False

Question 14

Due to simple operations and easy interconnection, which of the following communication types is recommended for NetEco northbound integration?

Options:

A.

WebService

B.

SNMP

C.

FTP

D.

PoE

Question 15

In the FusionModule2000, if a device port complies with the Modbus RTU protocol, which device is used to connect to smart ETH gateway?

Options:

A.

ETH converter

B.

Access actuator

C.

Skylight actuator

D.

AC actuator

Question 16

Options:

A.

2N deployment crossing rows

B.

2N deployment without crossing rows

C.

N+1 deployment crossing rows

D.

N+1 deployment without crossing rows