Customers complain that reported incidents are responded to at first but then seem to disappear after a while with the customer no longer receiving a proper follow-up.
What is the most likely cause of this?
In what situation can an individual applying for a security job be exempted from a background screening?
During lock-out/tag-out, which of the below is the most recommended procedure?
Out of the below, which one is not part of the needs analysis?
Key Performance Objectives (KPOs) need to be defined.
What is a suitable time period for KPOs?
Heavy equipment needs to be moved to another side of the computer room so that the three (3) workers can continue their drilling and cutting off the wall for a new cable tray. Four (4) staff members are required to move the equipment so there is one extra staff member required to assist. The safety manager who is overseeing the works is asked to help moving the equipment.
Is the safety manager allowed to step in and assist with the move?
The organization plans for implementing an information security management system (ISMS).
By doing so, what is the main objective?
Customer surveys and complaints provide input for
Which process is not part of the 6-step document management life cycle?
Of the below, which is a non-renewable energy source?
A recent cooling equipment failure resulted in a sudden shutdown of IT systems. Although the service provider was quickly on-site, it eventually took more than 12 hours for the cooling equipment to be repaired. Management wants to prevent this from happening again.
What is the best response?
Welding works need to be conducted.
Is a Permit to Work (PTW) required and if so, what type of PTW?
What describes the term predictive maintenance?
Training programs need to be selected.
Of the below, which is the first activity to start with?
Which, of the items below, is not part of operational cost (OPEX)?
Who is accountable for the outcome of a project?
Maintenance works need to be outsourced to a vendor. During the service requirement gap analysis, the data center manager concludes it is best to offload internal resources.
In which category has the gap been identified?
Maintenance needs to be outsourced; management demands a contract option with the lowest risk possible.
Which is the best option to choose?