Winter Sale Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

EMC D-PST-OE-23 Dell PowerStore Operate 2023 Exam Exam Practice Test

Demo: 28 questions
Total 96 questions

Dell PowerStore Operate 2023 Exam Questions and Answers

Question 1

A Storage Administrator has just installed PSTCLI on a Linux client. The administrator is unfamiliar with the PSTCLI command list. How can the administrator get a list of all PSTCLI commands from the cli> prompt?

Options:

A.

Type the +keys together

B.

Press the key

C.

Use the show all command

D.

Use the help all command

Question 2

What describes the ICM and ICD networks?

Options:

A.

Address type is dynamic and automatically reconfigured on discovery results

B.

They are NOT encrypted

C.

Address type is persistent throughout the life of the cluster and CANNOT to be modified

D.

They are encrypted with IPsec

Question 3

Refer to the exhibit.

A Storage Administrator noticed a drive LED blinking blue. What does this indicate?

Options:

A.

Is faulted

B.

Access activity

C.

Power up

D.

Identification is on

Question 4

The “svc_rescue_state list” shows a node in service mode. How can the node be returned to normal mode?

Options:

A.

svc_rescue_state normal

B.

svc_rescue_state clear

C.

svc_rescue_state exit

D.

svc_rescue_state quit

Question 5

What are the recommended number of network switches in a Dell PowerStore T environment?

Options:

A.

1

B.

2

C.

3

D.

4

Question 6

What describes the power requirements for Dell PowerStore?

Options:

A.

Lower model numbered systems require less AC line current than higher model numbered systems

B.

T models require less total power than X models

C.

X models require less total power than T models

D.

Lower model numbered systems require less input voltage (VAC) than higher model numbered systems

Question 7

What describes Dell PowerStore X power down?

Options:

A.

PowerStore X node, appliance, or cluster power down is done entirely with vCenter server commands

B.

Powering down a PowerStore X node, appliance, or cluster is done in the same manner as a PowerStore T

C.

PowerStore X node, appliance, or cluster power down utilizes the VSi plugin to perform the needed vCenter server operations

D.

Powering down a PowerStore X node, appliance, or cluster requires additional vCenter server commands

Question 8

What is the alert severity if the license expiration date is within a week?

Options:

A.

Warning

B.

Minor

C.

Major

D.

Information

Question 9

How many fan module failures can a node tolerate?

Options:

A.

0

B.

1

C.

2

D.

3

Question 10

Refer to the exhibit.

What type of cable is used for the ToR switch configuration shown for the S5248F-ON switches?

Options:

A.

10 GigE Cat 6 Ethernet RJ-45

B.

25 GigE Twinax

C.

100 GigE QSFP28

D.

10 GigE SFP optical cable

Question 11

Which Dell PowerStore network uses an appliance backplane?

Options:

A.

ICD

B.

MPIO

C.

Inter-node

D.

Inter-cluster management

Question 12

Which LED combination shows a connected and working node?

Options:

A.

power LED: steady green fault LED: amber

B.

power LED: blinking green fault LED: off

C.

power LED: blinking green fault LED: blue

D.

power: LED: steady green fault LED: off

Question 13

Order the steps to prepare for an NDU process.

Options:

Question 14

Which option is used when running the journalctl command to query log messages regardless of capitalization?

Options:

A.

option --casesensitive=YES/NO

B.

option -quotes

C.

option -ignorecase

D.

option --casesensitive=TRUE/FALSE

Question 15

Which number in the code-naming schema represents a beta distribution?

Options:

A.

8

B.

6

C.

4

D.

5

Question 16

What is a step in configuring the ToR data switches for a Dell PowerStore T?

Options:

A.

Configure a port for the discovery laptop

B.

Create VLANs for NAS servers

C.

Create VLAN for vMotion networks

D.

Configure ports for management on native VLAN

Question 17

A Storage Administrator has an existing single appliance Dell PowerStore 3000T cluster. An additional PowerStore 9000T has been purchased to add into the existing cluster.

How does the administrator proceed?

Options:

A.

Additional VLTi links on the ToR switching must be configured for the 9000T to support the increased inter-switch network load

B.

Add the new 9000T appliance into the cluster per the procedure; mixed models of the same type are supported

C.

Remove two of the four NVMe NVRAM drives from the 9000T the caching configuration of all clustered appliances must match

D.

The new appliance cannot be added to the cluster; appliance model and type must match when clustering appliances together

Question 18

Which formats are available to list alerts?

Options:

A.

Standard, NVP, CSV and JSON

B.

Table, XLS, CSV and JSON

C.

Table, NVP, CSV and XLS

D.

Table, NVP, CSV and JSON

Question 19

What does the output of the PSTCLI command “nas_server show” display from a Dell PowerStore T?

Options:

A.

If NAS servers are present if they are either NFS or Licensed

B.

Memory utilization and thread count for NFS NAS servers

C.

If NAS servers are present and if they are either Started or Degraded

D.

SIDs of SMB NAS servers joined to the AD Domain

Question 20

A Storage Administrator notices two fans in a Dell PowerStore are faulted. What describes the system behavior in this circumstance?

Options:

A.

A five-minute timer starts upon the second fan fault and the system shuts down automatically after the timer expires

B.

CPU clock speed is reduced by 50% to lower internal temperatures and the system continues normal operations

C.

An increased fan speed signal is sent to the surviving fans and the system continues normal operations

D.

Upon the second fan fault, all host I/O is terminated immediately and the PowerStore goes through the halt and vault process and shuts down

Question 21

From where can a data collection be initiated within Dell PowerStore Manager?

Options:

A.

Appliance, node, and storage resource

B.

Cluster, appliance, and alerts

C.

Cluster, appliance, and event log

D.

Node, storage resource, and alerts

Question 22

Which component is only replaceable by qualified personnel?

Options:

A.

Battery backup unit

B.

Embedded I/O module

C.

Memory module

D.

4-Port mezzanine card

Question 23

When a Dell PowerStore node powers up in service mode, what are the commands and sequence used from the appliance SSH client to restore the node back to normal?

Options:

A.

svc_rescue_state clear

svc_node reboot

B.

svc_node restart

svc_rescue_state start

C.

svc_rescue_state normal

svc_node start

D.

svc_node shutdown

svc_rescue_state clear

Question 24

A Storage Administrator needs to address specific fixes within their Dell PowerStore system. Which NDU software upgrade option is used for this situation?

Options:

A.

Hotfixes

B.

vCenter

C.

Drive firmware

D.

Software releases

Question 25

How is a defective DIMM displayed in Dell PowerStore Manager?

Options:

A.

Orange with an empty state

B.

Blue with a faulted state

C.

Orange with a faulted state

D.

Blue with an empty state

Question 26

Which Dell PowerStore model reserves the last two slots of the base enclosure for NVMe NVRAM?

Options:

A.

3000

B.

5000

C.

7000

D.

9000

Question 27

How is a defective embedded module displayed in Dell PowerStore Manager?

Options:

A.

Orange with an empty state

B.

Orange with a faulted state

C.

Blue with a faulted state

D.

Blue with an empty state

Question 28

During an emergency event an ESD-Kit is unavailable for FRU replacement. How can the work proceed?

Options:

A.

If FRU does not contain ESD-Kit, continue without it

B.

Order “Emergency ESD-Kit” ASAP

C.

Follow precautions described in the “Emergency Procedure”

D.

Use package material to build “provisional ESD-Kit”

Demo: 28 questions
Total 96 questions