Secure 75% Off All Exam Bundles This Black Friday! Use coupon code below to save! - Ends in 0d 00h 00m 00s - Coupon code: 75only

CIPS L5M9 Operations Management Exam Practice Test

Demo: 36 questions
Total 120 questions

Operations Management Questions and Answers

Question 1

What is the principal process-improvement purpose of Six Sigma?

Options:

A.

Increase customer satisfaction without measuring performance

B.

Achieve financial break-even

C.

Reduce harmful process variation and associated defects

D.

Reduce waste without addressing process variation

Question 2

Little Joy Ltd is a large company with several functional departments. Below are details of four departments. For each, you must decide which functional area of the business the department is, as well as the SERVQUAL Gap that each Department Lead is concerned with.

Department 1: This department is concerned with the creation of products. The products are created in line with BS EN 716-1 and undergo rigorous tests before they leave the factory. Many customers are unaware of the additional costs of testing to BS EN 716-1 and complain about the price of this product line.

Department 2: Other departments of the business are internal customers of this functional area and approach the Department Lead when they require something to be bought. Often the internal customers have unrealistic expectations of the timescales involved in the process and the Department Lead spends a lot of time explaining lead times and logistics.

Department 3: This functional area creates the budgets for the company and emails these to the Department Leads at the beginning of every quarter. Due to the complexity of the documents, other functional areas of the business often don’t understand the information provided.

Department 4: This area of the business is concerned with revenue, which has recently slumped. The Department Lead is conducting market surveys to find out the reason for this.

Complete the table below by listing the Functional Area of the business, and the corresponding SERVQUAL Gap. Each response should only be used once: procurement, finance, sales, production, satisfaction gap, delivery gap, standards gap, communication gap.

Department

Functional area

SERVQUAL gap

Department 1

Box 1

Box 5

Department 2

Box 2

Box 6

Department 3

Box 3

Box 7

Department 4

Box 4

Box 8

Which of the following will you put into box 3?

Options:

A.

procurement

B.

finance

C.

sales

D.

production

Question 3

The methodology for defining customer requirements and creating products that meet those needs is commonly known as which of the following?

Options:

A.

business process re-engineering

B.

value engineering

C.

quality function deployment

D.

defining business needs

Question 4

How can a company measure the dependability of an item it produces? Select TWO

Options:

A.

number of injuries caused by the product

B.

how quickly complaints are resolved

C.

variety of colours offered

D.

gross profit margin

E.

documentation is accurate

Question 5

A bread factory is introducing a 'Poka-Yoke' methodology to reduce defects. What will be the focus of this?

Options:

A.

inputs such as the quality of raw materials

B.

outputs- which will be measured against strict criteria

C.

staff- the reduction of human error

D.

machinery- ensuring there is little to no downtime in machinery use

Question 6

A lorry transporting goods between warehouses has a dashboard warning generated from monitored oil-condition information before equipment failure. Which form of maintenance is being applied?

Options:

A.

run to breakdown

B.

reactive

C.

preventative

D.

condition-based maintenance

Question 7

When quality is used as a foundation to build improvements in other areas such as dependability, what is this theory known as?

Options:

A.

brick-laying theory

B.

wave theory

C.

sand cone theory

D.

bridge theory

Question 8

Which of the following would most directly demonstrate the success of an organisation's order-winning objectives in a retail environment?

Options:

A.

increased costs

B.

streamlined operations procedures

C.

improved supplier relations

D.

customer loyalty

Question 9

Below are details of 4 local manufacturing companies. For each company you must decide what the main objective is for the organisation and what layout their manufacturing plant has.

Company 1: This company creates large, delicate products which are hard to move. The main aim of the company is to stand out from competitors due to the superior level of materials used and by using the latest forms of technology to create the items.

Company 2: This company produces 72 different items and has designated zones within its premises for the creation of each item. The zones are organised based on the technology used and some products may be passed between different zones to be completed. The company creates many different items in response to changing customer demands, with many product lines only lasting a single season.

Company 3: Company 3 creates one product which flows along a single production line, with staff members adding to the product on four different occasions. The company must produce a high volume of this singular product in order to break even. Therefore, there is always a steady flow of items through the plant and it is important there is no stoppage in production.

Company 4: This company produces small batches of products, as and when they are ordered by customers. Due to uncertainty in demand, a high profit margin is added to the cost of each item. Teams in the factory are grouped into different areas depending on the technological process they are using.

Complete the table below by listing the objective criteria and plant layout for each company. Each response should only be used once: flexibility, speed, quality, cost, functional layout, cell layout, product layout, fixed-position layout

Company

Performance objective

Plant layout

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 3?

Options:

A.

flexibility

B.

speed

C.

quality

D.

cost

Question 10

Farmer Ted harvests strawberries and sells these to retailers. Once the strawberries are collected from the field they are sent through a machine which will sort them by colour- ensuring only red strawberries are sent for packaging and any green, unripe strawberries are not. Which method of Poka Yoke is being used here?

Options:

A.

sequence method

B.

standardisation method

C.

constant number method

D.

contact method

Question 11

Managing Events and Relationships is a key application of Operations Management in which sector?

Options:

A.

retail

B.

agriculture

C.

manufacturing

D.

finance

Question 12

The Balanced Scorecard is a performance management approach which looks at measuring four areas of a business. Of those listed below, which is not an area traditionally measured within the Scorecard?

Options:

A.

business processes

B.

customer

C.

finance

D.

environment

Question 13

Blue Slipper Ltd is a multi-national organisation that produces a variety of cosmetic products. A team has been put together to create a strategy for the Marketing Department in order to increase sales and thus profitability. What level of strategy is being created?

Options:

A.

corporate level strategy

B.

business level strategy

C.

functional level strategy

D.

operational level strategy

Question 14

In what circumstances would an organisation use a Fishbone diagram?

Options:

A.

to depict changes in quality

B.

to find the cause of an issue

C.

to visually represent links between activities

D.

to demonstrate a pattern has occurred

Question 15

Spotted Elephant Ltd is a confectionery manufacturer whose operations department is headed by Brian. Brian is looking into Total Quality Management and ways of implementing this in the factory. He is considering the introduction of Total Productive Maintenance. What would this involve?

Options:

A.

using a pull inventory system

B.

servicing the machinery more frequently

C.

introducing quality assurance processes for the confectionery items produced

D.

business process re-engineering

Question 16

Dillan is an Operations Manager at Fancy Foods Ltd which is looking to expand the business into a new geographic area. Dillan is doing some research into three potential locations for a new manufacturing and warehouse facility. Which of the following would be primary considerations for Dillan? Select TWO

Options:

A.

the availability of labour

B.

potential business growth in the area

C.

flow of traffic in the surrounding area

D.

room for expansion

E.

utilities services available

Question 17

A fast-food restaurant provides a drink machine for customers to use, which allows the customer to select the drink that they wish by putting their cup under the machine and pushing a button. The machine will first drop ice into the cup, but this button will not work unless the cup is placed on an X. What is this an example of?

Options:

A.

redundancy

B.

preventive maintenance

C.

fail safing

D.

run to breakdown

Question 18

There are four manufacturing companies located on Seashell Industrial Estate. Each company creates a different product and employs a different maintenance approach to its operations. For each company, select the corresponding maintenance approach and the key operating process characteristic.

Company 1: This company creates craft beer and offers customers a tour of the brewery for a small charge. The brewing equipment is serviced monthly and the brewery is kept extremely clean. All equipment is labelled with the last service date.

Company 2: This company produces seasonal items such as Easter Eggs and Christmas Cake. The equipment has a control panel where lights will flash red advising staff to check oil levels and components. Staff can then report issues to the maintenance team if remedial work is required. Product demand fluctuates throughout the year.

Company 3: This equipment does not often break down and is only fixed when it is reported by staff as no longer working. Company 3 creates toys, providing a large range of product sizes and colours based on different customer requirements.

Company 4: Parts of the machine are serviced quarterly but in general, the machine is left to run its course and is then replaced when it is no longer financially viable to fix. The company produces cereal and the operating process is focused on the quantity produced and therefore uses standardised processes.

Complete the table below by listing the maintenance approach and operating process characteristic for each company. Each response should only be used once: preventive maintenance, run to breakdown maintenance, condition-based maintenance, mixed maintenance, volume, visibility, variation, variety

Company

Maintenance approach

Operating-process characteristic

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 8?

Options:

A.

volume

B.

visibility

C.

variation

D.

variety

Question 19

Below are details of five companies who operate a Total Quality Management System (TQM). For each company, select the system used and identify which area of the Balanced Scorecard this relates to.

Company 1: The focus of this company is to gather real-time data to assess the quality of products created during the manufacturing process. There are tight budgets and reworking any defects will affect the bottom line.

Company 2: This company is concerned about how their products are received. They have recently completed market research focused on their client’s feelings. The objective is now to improve the product’s look and performance to meet these expectations.

Company 3: The focus of this company is defining the customer requirements and translating this into a high-quality specification and effective operational process.

Company 4: Within this company there is a group of 6 employees who meet regularly with the objective of reducing issues that arise in the manufacturing of products.

Complete the table below by listing the TQM System used and the relevant Balanced Scorecard criteria for each company. Each response should only be used once: Quality Circle, Statistical Process Control, Kansei Engineering, Quality Function Deployment, Finance Criteria, Business Process Criteria, Learning and Growth Criteria, Customer Criteria.

Company

TQM technique

Balanced Scorecard perspective

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 3?

Options:

A.

quality circle

B.

statistical process control

C.

kansei engineering

D.

quality function deployment

Question 20

At Red Glass Ltd a strategy has been developed by the Operations Department to reduce costs and streamline supply chain operations. This is being incorporated into the organisation's overarching corporate strategy. What is the name given to this type of strategy development?

Options:

A.

value engineering

B.

bottom- up

C.

lean

D.

structure-related strategy

Question 21

What is the name given to a person in an organisation who is competent in the Six-Sigma approach?

Options:

A.

Quality Circle Leader

B.

Black Belt

C.

Master

D.

Project Owner

Question 22

Below are details of five companies who operate a Total Quality Management System (TQM). For each company, select the system used and identify which area of the Balanced Scorecard this relates to.

Company 1: The focus of this company is to gather real-time data to assess the quality of products created during the manufacturing process. There are tight budgets and reworking any defects will affect the bottom line.

Company 2: This company is concerned about how their products are received. They have recently completed market research focused on their client’s feelings. The objective is now to improve the product’s look and performance to meet these expectations.

Company 3: The focus of this company is defining the customer requirements and translating this into a high-quality specification and effective operational process.

Company 4: Within this company there is a group of 6 employees who meet regularly with the objective of reducing issues that arise in the manufacturing of products.

Complete the table below by listing the TQM System used and the relevant Balanced Scorecard criteria for each company. Each response should only be used once: Quality Circle, Statistical Process Control, Kansei Engineering, Quality Function Deployment, Finance Criteria, Business Process Criteria, Learning and Growth Criteria, Customer Criteria.

Company

TQM technique

Balanced Scorecard perspective

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 1?

Options:

A.

quality circle

B.

statistical process control

C.

kansei engineering

D.

quality function deployment

Question 23

Below are details of 4 local manufacturing companies. For each company you must decide what the main objective is for the organisation and what layout their manufacturing plant has.

Company 1: This company creates large, delicate products which are hard to move. The main aim of the company is to stand out from competitors due to the superior level of materials used and by using the latest forms of technology to create the items.

Company 2: This company produces 72 different items and has designated zones within its premises for the creation of each item. The zones are organised based on the technology used and some products may be passed between different zones to be completed. The company creates many different items in response to changing customer demands, with many product lines only lasting a single season.

Company 3: Company 3 creates one product which flows along a single production line, with staff members adding to the product on four different occasions. The company must produce a high volume of this singular product in order to break even. Therefore, there is always a steady flow of items through the plant and it is important there is no stoppage in production.

Company 4: This company produces small batches of products, as and when they are ordered by customers. Due to uncertainty in demand, a high profit margin is added to the cost of each item. Teams in the factory are grouped into different areas depending on the technological process they are using.

Complete the table below by listing the objective criteria and plant layout for each company. Each response should only be used once: flexibility, speed, quality, cost, functional layout, cell layout, product layout, fixed-position layout

Company

Performance objective

Plant layout

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 2?

Options:

A.

flexibility

B.

speed

C.

quality

D.

cost

Question 24

Which of the following items created by an organisation are intangible? Select TWO

Options:

A.

Legal Advice provided by a solicitor

B.

A cup of coffee from a restaurant

C.

A massage given at a Spa

D.

A shirt bought at a retail outlet

Question 25

Below are details of 4 local manufacturing companies. For each company you must decide what the main objective is for the organisation and what layout their manufacturing plant has.

Company 1: This company creates large, delicate products which are hard to move. The main aim of the company is to stand out from competitors due to the superior level of materials used and by using the latest forms of technology to create the items.

Company 2: This company produces 72 different items and has designated zones within its premises for the creation of each item. The zones are organised based on the technology used and some products may be passed between different zones to be completed. The company creates many different items in response to changing customer demands, with many product lines only lasting a single season.

Company 3: Company 3 creates one product which flows along a single production line, with staff members adding to the product on four different occasions. The company must produce a high volume of this singular product in order to break even. Therefore, there is always a steady flow of items through the plant and it is important there is no stoppage in production.

Company 4: This company produces small batches of products, as and when they are ordered by customers. Due to uncertainty in demand, a high profit margin is added to the cost of each item. Teams in the factory are grouped into different areas depending on the technological process they are using.

Complete the table below by listing the objective criteria and plant layout for each company. Each response should only be used once: flexibility, speed, quality, cost, functional layout, cell layout, product layout, fixed-position layout

Company

Performance objective

Plant layout

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 5?

Options:

A.

functional layout

B.

cell layout

C.

product layout

D.

fixed-position layout

Question 26

Under what circumstances would an 'intermittent operations' process be the most suitable?

Options:

A.

many different items are produced in low quantities

B.

where quality assurance must be carried out regularly

C.

an organisation with low numbers of manufacturing staff

D.

in high value, high volume production

Question 27

Elderberry Ltd is an established organisation in the agricultural industry but has recently expanded into manufacturing its own juice range. The company is at the 'Introduction' stage of the product lifecycle and is attempting to bring new products to market. Which of the following performance objectives would be the most dominant at this stage of the lifecycle?

Options:

A.

cost

B.

flexibility

C.

speed

D.

dependability

Question 28

Logan has recently been appointed to the position of Operations Manager within in IT firm. The CEO has charged Logan with improving the performance of the department, in particular, in ensuring that promises made to customers are kept. Logan is therefore prioritising KPIs for the team including the delivering of services on-time and customer retention. Which of the 5 Performance Objectives of Operations Management is Logan focusing on?

Options:

A.

dependability

B.

flexibility

C.

quality

D.

speed

Question 29

Penny is the Operations Manager at a small furniture manufacturing company that makes tables and chairs, among other wooden household items. In the manufacturing site there is a small warehouse which stores inventory which is used in unforeseen circumstances such as a late delivery. What is the name given to this type of inventory?

Options:

A.

anticipation inventory

B.

buffer stock

C.

work-in progress

D.

transit inventory

Question 30

Isobel is an Operations Manager at a plastics company and is conducting a Failure Mode and Effects Analysis (FMEA) on some products that the company manufactures. Which of the following areas would malfunctions be detected in when conducting a FMEA? Select TWO

Options:

A.

design

B.

delivery

C.

operations

D.

process

Question 31

Which of the following are considered 'transformed resources' and an input into the Operations Process (input- process-output)? Select THREE

Options:

A.

customers

B.

raw materials

C.

employees

D.

money

E.

information

Question 32

Which of the following is not an example of Statistical Process Control?

Options:

A.

Histogram

B.

Check Sheet

C.

Flowchart

D.

Scatter Diagram

Question 33

Little Joy Ltd is a large company with several functional departments. Below are details of four departments. For each, you must decide which functional area of the business the department is, as well as the SERVQUAL Gap that each Department Lead is concerned with.

Department 1: This department is concerned with the creation of products. The products are created in line with BS EN 716-1 and undergo rigorous tests before they leave the factory. Many customers are unaware of the additional costs of testing to BS EN 716-1 and complain about the price of this product line.

Department 2: Other departments of the business are internal customers of this functional area and approach the Department Lead when they require something to be bought. Often the internal customers have unrealistic expectations of the timescales involved in the process and the Department Lead spends a lot of time explaining lead times and logistics.

Department 3: This functional area creates the budgets for the company and emails these to the Department Leads at the beginning of every quarter. Due to the complexity of the documents, other functional areas of the business often don’t understand the information provided.

Department 4: This area of the business is concerned with revenue, which has recently slumped. The Department Lead is conducting market surveys to find out the reason for this.

Complete the table below by listing the Functional Area of the business, and the corresponding SERVQUAL Gap. Each response should only be used once: procurement, finance, sales, production, satisfaction gap, delivery gap, standards gap, communication gap.

Department

Functional area

SERVQUAL gap

Department 1

Box 1

Box 5

Department 2

Box 2

Box 6

Department 3

Box 3

Box 7

Department 4

Box 4

Box 8

Which of the following will you put into box 7?

Options:

A.

satisfaction gap

B.

delivery gap

C.

standards gap

D.

communication gap

Question 34

Below are details of five companies who operate a Total Quality Management System (TQM). For each company, select the system used and identify which area of the Balanced Scorecard this relates to.

Company 1: The focus of this company is to gather real-time data to assess the quality of products created during the manufacturing process. There are tight budgets and reworking any defects will affect the bottom line.

Company 2: This company is concerned about how their products are received. They have recently completed market research focused on their client’s feelings. The objective is now to improve the product’s look and performance to meet these expectations.

Company 3: The focus of this company is defining the customer requirements and translating this into a high-quality specification and effective operational process.

Company 4: Within this company there is a group of 6 employees who meet regularly with the objective of reducing issues that arise in the manufacturing of products.

Complete the table below by listing the TQM System used and the relevant Balanced Scorecard criteria for each company. Each response should only be used once: Quality Circle, Statistical Process Control, Kansei Engineering, Quality Function Deployment, Finance Criteria, Business Process Criteria, Learning and Growth Criteria, Customer Criteria.

Company

TQM technique

Balanced Scorecard perspective

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 4?

Options:

A.

quality circle

B.

statistical process control

C.

kansei engineering

D.

quality function deployment

Question 35

In which stage of development does the operations department contribute competitive advantage to an organisation?

Options:

A.

internally neutral

B.

externally neutral

C.

internally supportive

D.

externally supportive

Question 36

Little Joy Ltd is a large company with several functional departments. Below are details of four departments. For each, you must decide which functional area of the business the department is, as well as the SERVQUAL Gap that each Department Lead is concerned with.

Department 1: This department is concerned with the creation of products. The products are created in line with BS EN 716-1 and undergo rigorous tests before they leave the factory. Many customers are unaware of the additional costs of testing to BS EN 716-1 and complain about the price of this product line.

Department 2: Other departments of the business are internal customers of this functional area and approach the Department Lead when they require something to be bought. Often the internal customers have unrealistic expectations of the timescales involved in the process and the Department Lead spends a lot of time explaining lead times and logistics.

Department 3: This functional area creates the budgets for the company and emails these to the Department Leads at the beginning of every quarter. Due to the complexity of the documents, other functional areas of the business often don’t understand the information provided.

Department 4: This area of the business is concerned with revenue, which has recently slumped. The Department Lead is conducting market surveys to find out the reason for this.

Complete the table below by listing the Functional Area of the business, and the corresponding SERVQUAL Gap. Each response should only be used once: procurement, finance, sales, production, satisfaction gap, delivery gap, standards gap, communication gap.

Department

Functional area

SERVQUAL gap

Department 1

Box 1

Box 5

Department 2

Box 2

Box 6

Department 3

Box 3

Box 7

Department 4

Box 4

Box 8

Which of the following will you put into box 8?

Options:

A.

satisfaction gap

B.

delivery gap

C.

standards gap

D.

communication gap

Demo: 36 questions
Total 120 questions