A contract company that has never worked at your site is the only contract company technically capable of performing a critical task at your site. The contract company’s safety record is well below your company’s safety performance criteria. What activities do you take while they are working on-site? (select all that apply)
Which of the following statements apply to the purpose of an incident investigation procedure? Select all that apply.
After an incident with fatal consequences, you are requested by top management to form an investigation team. Who of the following would be the most suitable candidate to lead the company investigation?
Which of the following conditions could indicate performance problems in a plant’s Asset Integrity program? (select all that apply)
Which of the following is generally a disadvantage of a rupture disc vs a relief valve?
A process calls for the addition of a reactant over a certain period of time. The flow controller on the reactant’s feed line was out of calibration and reduced the flow rate of the reactant. The operator noticed the addition rate was too low and, contrary to the operating procedures, he opened a bypass valve around the flow control valve to increase the flow rate. As a result, the operator added the remaining reactant too quickly, and a runaway reaction occurred. Weaknesses in which of the following Risk Based Process Safety elements could have contributed to the cause of this incident? (Select all that apply)
Which of the following are best used to verify that an operator adequately understands training? (Select all that apply)
Which of the following statements are true with respect to Compliance with Standards? (select all that apply)
The risk of an incident is determined by considering its likelihood and:
To maintain a dependable Operational Readiness practice (select all that apply):
Austenitic stainless steels are typically susceptible to which of the following corrosion mechanisms specifically attributed to chloride exposure? (Select all that apply)
The photo below represents part of the overhead piping for a reactor with a 90 psig maximum allowable working pressure (MAWP). Which of the following statements are correct? (select all that apply)

A process safety audit team felt that their access to operating personnel was being limited. Which of the following statements would be valid with respect to this situation? (Select all that apply)
Leading process safety metrics can help: (select all that apply)
A facility has implemented a program of tracking the rate of submittals of process safety related employee suggestions. Which Risk Based Process Safety element does this program demonstrate?
A rupture pin relief device operates when:
The Risk Based Process Safety element which is designed to verify that a process is verified safe to start after a short term shutdown is Operational Readiness. True or False?
Secondary dust explosion consequences are often related to poor housekeeping, true or false?
Which of the following Risk-Based Process Safety elements are expected to be most directly and frequently involved with the Emergency Management Element? (select all that apply)
As the temperature increases, the upper and lower flammability limits change in the following fashion:
Which of the following are characteristics of a good Process Safety Culture (check all that apply)?
A toxic release occurs. Which conditions are more likely to result in the highest downwind concentration at a given distance?
Which of the following can be considered applicable inspection methods as part of an Inspection/Testing/Preventive Maintenance program under the Asset Integrity and Reliability Element? (Select all that apply)
Which of the following approaches can be used to prevent fires and explosions? (select all that apply)
Which of the following would be most effective as a leading metric for a Management of Change program?
A material had been oxidized many times, without incident, under an oxygen atmosphere in a small pilot plant vessel. While scaling up to a larger vessel, the plant engineers decided they could improve gas/liquid contact by using a more efficient feed dispersing system. This dispersing system filled the reactor ' s vapor space with a fine combustible mist. Several hours after startup, the vessel was ruptured by an internal mist explosion. The source of ignition was a small amount of catalyst left over from an earlier set of experiments. This was a phenomenon that the engineers had not considered. Which of the following risk based process safety elements could have helped prevent this incident? (Select all that apply)
Sources of information on previous incidents to be reviewed during a Process Hazard Analysis can include: (select all that apply)
A contractor has been hired to apply a proprietary coating in an unoccupied process area. The coating has hazardous properties. What documentation should the contractor provide to the site owner before starting work? (Select all that apply)
The training for maintenance personnel only needs to cover the testing and maintenance procedures of the specific equipment they service, true or false?
Which of the following statements is correct pertaining to Process Safety Audits? (Select all that apply)
A Management of Change system should address all types of changes to the process that can be reasonably foreseen.
The accumulation for a relief device is:

This heater was severely damaged during startup as a result of a firebox explosion. The operator had difficulty with the instrumentation and decided to complete the startup by bypassing the interlocks. The main gas valve was opened and gas filled the heater while the pilots were off.
Upon lighting of the pilots, the heater exploded destroying the casing and damaging several tubes. Identify and discuss what elements of Risk-Based Process Safety, had they been implemented more effectively, could have reduced or eliminated the likelihood of this event occurring or reduced the consequences.